Innovus™ Abraisive Perf Frac Assembly

Utilizing the proven Innovus™ Frac Isolation Assembly, this system allows the operator to jet perforate holes into the casing, perform the frac job, then move up the hole and repeat as many times as desired. The system requires a newly cased well or a well with stim pressure integrity above the desired frac zone. This system is not as efficient as one utilizing Innovus™ frac sleeves but does give the operator an option on DUC wells where PinPoint stimulation is preferred over cluster plug and perf methods.